Site visit details

Overview

Catchment Broken River
Site Lima East Creek at Swanpool-Lima Road GB_LEC009
Date and Time Sunday 3rd December 2017 14:40pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Rain mm Water ° C Turb NTU
Sample 60 6.5 185.5 19.4 50
Weather sunny
Last rainfall During the last 24 hours 10.50
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Stained brown
Stream depth Other:1.00m
Stream width Other:6.00
Hazards
Litter/Pollutants

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au