Site visit details

Overview

Catchment Broken River
Site Lima East Creek at Creamery Lane GB_LEC008
Date and Time Sunday 3rd December 2017 14:15pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 60 6.4 185.5 18.9 28
Weather overcast
Last rainfall During the last 24 hours 10.50
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Stained brown
Stream depth
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au