Site visit details

Overview

Catchment Lake Corangamite
Site Lake Beeac, at end of Wallace St, Beeac CO_BEE020
Date and Time Thursday 15th February 2018 13:30pm
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample
Weather windy
Last rainfall During the last week 2.00
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards Very high wind.
Litter/Pollutants

As well as being overcast, it was very windy. At Mt Gellibrand at 13.30 pm the windspeed was 37 km/hr with gusts up to 48 km/hr (BoM site - observations)

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au