Site visit details

Overview

Catchment Bunyip River
Site Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby. ME_DBC250
Date and Time Friday 23rd March 2018 10:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 65.33 6.2 560 7.4 0.03 24.8 17.8 10
Weather sunny
Last rainfall During the last week 0.60
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

Good to see the dissolved oxygen has risen after the instream has ceased.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au