Waterwatch Data Portal
ME_DBC250 Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby.
23 March 2018
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby. ME_DBC250 |
Date and Time | Friday 23rd March 2018 10:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 65.33 | 6.2 | 560 | 7.4 | 0.03 | 24.8 | 17.8 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week 0.60 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
Good to see the dissolved oxygen has risen after the instream has ceased.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au