Waterwatch Data Portal
ME_YKA020 Kalkallo Creek, Camerons Lane, Beveridge North West
17 June 2018
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Kalkallo Creek, Camerons Lane, Beveridge North West ME_YKA020 |
Date and Time | Sunday 17th June 2018 14:00pm |
Approved | Approved |
Physical Chemical Tests
Turb FTU | Turb NTU | |
---|---|---|
Sample | 5000 | 2900 |
Weather | raining |
---|---|
Last rainfall | Raining now |
Flow estimate | FLOOD / OVERBANK: flow is high and water level has exceeded bank capacity and is connecting with floodplain |
Water Appearance | Muddy |
Stream depth | |
Stream width | < 2m |
Hazards | |
Litter/Pollutants |
First sample collected after very heavy rainfall. Upstream erosion gullies visibile. Rainfall intense. Results determined by dilutions due to high turbidity with 1:10 (tube) and 1:20 (colorimeter)
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au