Waterwatch Data Portal
ME_ECN300 Cannibal Creek at Garfield North Rd, Garfield North
7 March 2012
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Cannibal Creek at Garfield North Rd, Garfield North ME_ECN300 |
Date and Time | Wednesday 7th March 2012 10:40am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 231 | 0.05 | 14 | 15 | 10 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Clear,Milky |
Stream depth | 51cm - 99cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Water level has dropped again as silt has built up on creek bed. Water level is very variable as in some areas the mud/silt is above the water level ph: hanna tester not working- battery Over the past 3 days, we have had 25 mm of rain (missed doing the testing on 7/12/2011)
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au