Site visit details

Overview

Catchment Barwon River
Site David St Stormwater drain, The Esplanade, Indented Head CO_IND009
Date and Time Saturday 3rd February 2018 11:20am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 22.26 1.5 68000 8 0.08 25 21 10
Weather sunny
Last rainfall During the last week
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants

Drain opened to the sea 2 days earlier then closed by the tide. Baiscally sea water now.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au