Waterwatch Data Portal
CO_IND009 David St Stormwater drain, The Esplanade, Indented Head
3 February 2018
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | David St Stormwater drain, The Esplanade, Indented Head CO_IND009 |
Date and Time | Saturday 3rd February 2018 11:20am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 22.26 | 1.5 | 68000 | 8 | 0.08 | 25 | 21 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Drain opened to the sea 2 days earlier then closed by the tide. Baiscally sea water now.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au