Waterwatch Data Portal
ME_YMD100 Tandarook stormwater drain into Mullum Mullum Ck, Donvale
10 July 2018
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Tandarook stormwater drain into Mullum Mullum Ck, Donvale ME_YMD100 |
Date and Time | Tuesday 10th July 2018 14:00pm |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 90.89 | 10.5 | 210 | 1.02 | 7.1 | 0.039 | 10 | 9 | 10 |
Weather | overcast |
---|---|
Last rainfall | During the last week 0.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Other |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants | bottles,paper,plastic |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au