Site visit details

Overview

Catchment Yarra River
Site Darebin Creek at Darebin Parklands, ford (dog crossing) U/S railway bridge. ME_YDA558
Date and Time Friday 22nd June 2018 10:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.4 6 720 7.9 0.1 11.5 10 15
Weather sunny
Last rainfall During the last week 27.20
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Muddy
Stream depth 0 - 50cm
Stream width > 5m
Hazards
Litter/Pollutants plastic

Water was quite silty / turbid, although this wasn't reflected in turbidity result.

For this reason, it would be great to have a portable turbidity meter to compare turbidity results with.

Unusually high phosphate and ammonium results.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au