Waterwatch Data Portal
ME_YDP037 Damper Creek, Eastern branch, below Alvie Hall carpark, 30 metres above confluence with main creek.
14 June 2018
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Damper Creek, Eastern branch, below Alvie Hall carpark, 30 metres above confluence with main creek. ME_YDP037 |
Date and Time | Thursday 14th June 2018 10:25am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.04 | 77.18 | 8.7 | 430 | 1.9935 | 6.4 | 0.05542 | 12.5 | 10 | 20 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Clear |
Stream depth | Other:not measured |
Stream width | < 2m |
Hazards | |
Litter/Pollutants | bottles,paper,packets |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au