Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023
Date and Time Sunday 2nd April 2017 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.4 150 6.5 0 16.5 17 30
Weather cloudy
Last rainfall During the last week 10.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 1m - 2m
Stream width
Hazards
Litter/Pollutants

Thomas, Eu, Elaine, Anne

Inconsistant DO readings not included (RA)

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au