Waterwatch Data Portal
ME_YGR023 Blackburn Lake at Heron Point opposite Naughton Gve Blackburn
7 May 2017
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023 |
Date and Time | Sunday 7th May 2017 11:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.3 | 38.06 | 4.1 | 160 | 6.5 | 0.087 | 13 | 12 | 25 |
Weather | |
---|---|
Last rainfall | During the last week 5.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | |
Stream depth | 1m - 2m |
Stream width | |
Hazards | |
Litter/Pollutants |
EB, SD, TC, AP
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au