Waterwatch Data Portal
ME_ETN900 Tanti Creek upstream of Estuary (land side of Esplanade)
30 March 2012
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900 |
Date and Time | Friday 30th March 2012 15:15pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FAU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 5620 | 8.2 | 0.02 | 28 | 20 | 10 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Scummy |
Stream depth | 51cm - 99cm |
Stream width | 1.3 |
Hazards | |
Litter/Pollutants |
northern site remains overgrown with grasses, weeds, small fish visible, +butterflies. iron oxidations oozing from rocks near site. site looks good Barbara Roff's first practical site visit; Lisa Kordus monitoring us.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au