Waterwatch Data Portal
ME_ESU450 Sunshine Creek at outfall to Port Phillip Bay, Mt Martha
2 April 2012
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at outfall to Port Phillip Bay, Mt Martha ME_ESU450 |
Date and Time | Monday 2nd April 2012 11:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 2800 | 8.5 | 0.03 | 20 | 14 | 15 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 0.6 |
Hazards | |
Litter/Pollutants | plastic,polystyrene |
Persons monitoring: Geoff Linnell and Gill Gordon last rainfall 0.2mm on 31/3 high to medium flow, minor foaming; water looking reasonably clear rainfall: last week 0.4mm; last month 75.8mm: 2012 to date 178.4mm (Devilbend reservoir figures from melb water website)
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au