Site visit details

Overview

Catchment Yarra River
Site Merri Creek @ Tate Reserve under the footbridge, Coburg ME_YMR135
Date and Time Friday 27th March 2009 11:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 920 8.2 0.2 19 17.9 10
Weather overcast
Last rainfall During the last week
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au