Site visit details

Overview

Catchment Yarra River
Site Diamond Creek, Railway Pde, Eltham ME_YDI810
Date and Time Saturday 19th May 2012 10:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 6 510 7.1 0.05 13.6 11.1 30
Weather raining
Last rainfall Raining Now
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Muddy
Stream depth 0.65
Stream width 12.0
Hazards
Litter/Pollutants bottles,cans,paper,plastic,other
Other litter includes car tyre; the bank some 20 metres downstream is deteriorating (timber sleepers are falling away). Testers today were Garry, Joan & Bill with Norma completing the form.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au