Site visit details

Overview

Catchment Yarra River
Site Gardiners Creek upstream of Blackburn Lake, at Pobblebonk point, adjacent to Vegemite Creek ME_YGR006
Date and Time Sunday 7th October 2018 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Rain mm rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.08 63.52 6.4 250 6.4 0.037 20 15 33
Weather sunny
Last rainfall More than a week ago
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Stained brown
Stream depth 1m - 2m
Stream width
Hazards
Litter/Pollutants

Monitors: Elaine B., John S., Wira Y., Amber, Tanveer A.

Birds: 1 Wood Duck

Note: Powder reagent for Phosphate test was added using the new (white) spoon which is a bit larger than the older spoon. Phosphate reading is higher compared to previous tests.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au