Waterwatch Data Portal
ME_EDV300 Devilbend Reservoir, western tip, accessible by 2wd track
19 September 2018
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Devilbend Reservoir, western tip, accessible by 2wd track ME_EDV300 |
Date and Time | Wednesday 19th September 2018 08:50am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 83.9904 | 9 | 1080 | 8.7 | 0 | 14 | 12.1 | 9 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 5.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | very soft mud |
Litter/Pollutants |
water level a bit lower.frogs present loats of birds in the bush . cloudy at times and windy
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au