Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, downstream of Thornbury High School , off Theobald Street, Thornbury ME_YDA485
Date and Time Monday 15th October 2018 10:50am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1030 23 19.2 10
Weather sunny
Last rainfall More than a week ago
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear,Scummy,Smelly
Stream depth
Stream width
Hazards
Litter/Pollutants plastic,cans,clothing,packets

Scummy foam collecting on a branch across the creek.

Warmer temperature than our last visit.

Water level was lower than usual.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au