Waterwatch Data Portal
CO_SWA110 Lake Victoria outlet @ Bellarine Hwy
24 October 2018
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Lake Victoria outlet @ Bellarine Hwy CO_SWA110 |
Date and Time | Wednesday 24th October 2018 08:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 64.28 | 5.2 | 67500 | 7.7 | 0.03 | 11 | 11.5 | 18 |
Weather | cloudy |
---|---|
Last rainfall | During the last week |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
The area has about half normal level, may have been drained for works on the bridge over, not sure.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au