Site visit details

Overview

Catchment Campaspe River
Site Five Mile Creek, High St Woodend NC_FMC450
Date and Time Saturday 8th September 2018 12:25pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 609 7.1 0.01 16.5 9.5 9
Weather sunny
Last rainfall During the last week 24.00
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Clear,Stained brown
Stream depth 2m
Stream width > 5m
Hazards
Litter/Pollutants

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au