Site visit details

Overview

Catchment Dandenong
Site Dandenong Creek, Liverpool Road Retarding Basin, Boronia ME_DDN015
Date and Time Monday 13th August 2018 13:30pm
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 65.6 7.4 210 7.6 0 13 10 14
Weather overcast
Last rainfall During the last 24 hours
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

First monitoring event for this group.

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Fair 6 Fair 6 Good 4 Good 8 27

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au