Waterwatch Data Portal
ME_EBD200 Bittern Reservoir Constructed Wetland
18 December 2018
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Bittern Reservoir Constructed Wetland ME_EBD200 |
Date and Time | Tuesday 18th December 2018 12:05pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Air ° C | Water ° C | |
---|---|---|---|---|---|---|
Sample | 74.43 | 6 | 1610 | 8.3 | 31 | 26.1 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 20.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | Other:25 |
Stream width | > 5m |
Hazards | steep banks |
Litter/Pollutants |
no rubbish at site. first time tested .recent heavy rain and warm sunny weather. water is clear. a lot of new growth in and around the pond.a lot of insects near the water.water level 25 cm
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au