Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Tuesday 12th February 2019 10:45am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 0 69.29 6.6 1993 6.4 0.07 14.5 17.4 49.27
Weather raining
Last rainfall Raining now 7.00
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Foamy/frothy,Muddy
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants polystyrene

Visit timed to test water quality immediately after rain (ie first flush). 7mm of rain in last 3 hours.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au