Waterwatch Data Portal
ME_ETO295 Toomuc Creek opposite Little Albert daycare centre
27 March 2019
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Toomuc Creek opposite Little Albert daycare centre ME_ETO295 |
Date and Time | Wednesday 27th March 2019 15:30pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 31.72 | 3 | 309 | 7.6 | 0.015 | 22 | 18 | 0 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 12.20 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | black berries |
Litter/Pollutants | bottles,paper,plastic,waxed cardboard,cans,packets,polystyrene,other: metal shoe horn |
there is building development on the other bank
also possible bridge coming
more water in the creek but no flow
lot more vegetation growing in river bank
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au