Waterwatch Data Portal
ME_EMA300 Manton Creek @ Punty Lane, Shoreham
29 March 2019
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Manton Creek @ Punty Lane, Shoreham ME_EMA300 |
Date and Time | Friday 29th March 2019 09:15am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 68.31 | 7 | 1790 | 7.9 | 0.04 | 18 | 14 | 10 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | Other:Variable - from 10 - 50 cm |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au