Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Wednesday 10th April 2019 13:20pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 0.02 78.56 7.8 2830 6.5 0.12 14.5 15.3 22.8
Weather overcast
Last rainfall During the last 24 hours 15.00
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Scummy,Muddy
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

Typical of water after a significant stormwater flow when creek is running higher than normal and slowly subsiding

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au