Waterwatch Data Portal
ME_YDI815_RD Diamond Creek at Catholic Ladies College Eltham
7 May 2019
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek at Catholic Ladies College Eltham ME_YDI815_RD |
Date and Time | Tuesday 7th May 2019 14:30pm |
Approved | Approved |
Physical Chemical Tests
pH pH Units | Reac ppb | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|
Sample | 7 | 0 | 17.4 | 14.9 | 30 |
Weather | |
---|---|
Last rainfall | 5mm |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | other |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au