Site visit details

Overview

Catchment Yarra River
Site Five Mile Creek, end of Governors Road, Essendon ME_YFM980
Date and Time Saturday 18th May 2019 10:00am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 7 200 7 0.15 12 12 63
Weather sunny
Last rainfall During the last week 8.20
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Stained brown,Muddy,Milky
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants bottles,paper,plastic,cans,packets

Woodlands Park pond drainning and works during this week, ecplaining higher turbidity and colouration of water.
High rainfall last weekend and drainage has flattened creekside plants and brought in more trash.

Slower flow and stagnant at flat pool section. 

Julia came for shadow sampling and corrected some flaws in our data gathering techniques, dropped off some new calibration solutions, colour wheels, gloves and batteries.  Thanks Julia :)

 

 

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au