Waterwatch Data Portal
ME_YDA435 Darebin Creek, upstream Murray Road/Southern Road bridge, Preston/Heidelberg Heights.
26 May 2019
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Darebin Creek, upstream Murray Road/Southern Road bridge, Preston/Heidelberg Heights. ME_YDA435 |
Date and Time | Sunday 26th May 2019 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 66.31 | 7 | 810 | 7.3 | 0.15 | 13.3 | 12.8 | 22 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 0.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | bottles,paper,cans,packets,other: empty plastic sleeves/packets of injection needles |
Has rained the night before, creek level has risen a bit. Evidence of fairly heavy rain, mud on paths, branches and leaf litter in creek
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au