Waterwatch Data Portal
ME_ETN900 Tanti Creek upstream of Estuary (land side of Esplanade)
27 May 2019
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900 |
Date and Time | Monday 27th May 2019 16:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FAU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.04 | 72.09 | 7.7 | 682 | 7.5 | 0.05 | 11 | 12.3 | 103.7 |
Weather | raining |
---|---|
Last rainfall | During the last 24 hours 10.00 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants | plastic,cans,packets,polystyrene |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au