Site visit details

Overview

Catchment Loddon River
Site Bendigo Creek, end of Elm St Golden Square NC_BGO021
Date and Time Monday 29th July 2019 17:30pm
Approved Approved

Notes

Physical Chemical Tests

D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 9.5 528 7.4 0.03 13 11 24
Weather sunny
Last rainfall During the last 24 hours 5.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Muddy
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,paper,plastic,cans,packets

frog calls audible

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au