Waterwatch Data Portal
ME_MJA450 Jacksons Creek @ Emu Bottom Wetlands
8 March 2019
Site visit details
Overview
Catchment | Maribyrnong River |
---|---|
Site | Jacksons Creek @ Emu Bottom Wetlands ME_MJA450 |
Date and Time | Friday 8th March 2019 17:00pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 82.95 | 8 | 710 | 8.1 | 0.01 | 24 | 17 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 2m |
Stream width | > 5m |
Hazards | |
Litter/Pollutants |
Increased leaf litter
Possible drop in water level
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au