Waterwatch Data Portal
ME_ETN900 Tanti Creek upstream of Estuary (land side of Esplanade)
15 August 2019
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900 |
Date and Time | Thursday 15th August 2019 10:20am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FAU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.07 | 79.8 | 8.7 | 2070 | 7.3 | 0.11 | 11.2 | 11.2 | 32.14 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 64.00 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | 51cm - 99cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants | bottles,paper,plastic,cans,packets,polystyrene |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au