Site visit details

Overview

Catchment Yarra River
Site Blackburn Lake at Heron Point opposite Naughton Gve Blackburn ME_YGR023
Date and Time Sunday 4th August 2019 11:05am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.04 71.74 8 138 6.9 0.013 11 10.5 16
Weather overcast
Last rainfall During the last 24 hours 0.00
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Muddy
Stream depth 1m - 2m
Stream width
Hazards
Litter/Pollutants plastic

Monitors: Amber, Alfoncina, Susan Wan, Wira, Su Dempsy, Tanveer

Note: All tests were done at water temperature 19.2 degrees centigrade

Other Observations: 2 cormorants, 1 pacific black duck, 1 magpie

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au