Waterwatch Data Portal
ME_MSO010 Upper Stony Creek - upstream of capital works
15 March 2019
Site visit details
Overview
Catchment | Maribyrnong River |
---|---|
Site | Upper Stony Creek - upstream of capital works ME_MSO010 |
Date and Time | Friday 15th March 2019 13:00pm |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.2 | 65.23 | 6 | 160 | 6.6 | 0.15 | 17 | 19.4 | 10 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Oily |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants | bottles,oil,plastic,cans,packets,other: bar stool |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au