Site visit details

Overview

Catchment Bunyip River
Site Devilbend Reservoir, western tip, accessible by 2wd track ME_EDV300
Date and Time Tuesday 17th December 2019 10:00am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 90.02 8 1050 9.1 0 23 21 9
Weather sunny
Last rainfall More than a week ago 2.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards none . normal caution required
Litter/Pollutants

no rubbish.water level dropping.a lot of new growth in and near the site

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au