Site visit details

Overview

Catchment Campaspe River
Site Five Mile Creek, High St Woodend NC_FMC450
Date and Time Saturday 23rd November 2019 15:45pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 545 7.3 0.07 26 16.5 13
Weather cloudy
Last rainfall More than a week ago
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear,Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au