Waterwatch Data Portal
ME_YMR117 Alister Road stormwater drain into Merri Creek, Brunswick East
13 January 2020
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Alister Road stormwater drain into Merri Creek, Brunswick East ME_YMR117 |
Date and Time | Monday 13th January 2020 09:45am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 56.44 | 5 | 170 | 7.5 | 0.06 | 26.2 | 21.3 | 9 |
Weather | sunny |
---|---|
Last rainfall | During the last week 10.00 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants |
Went out sampling this site after call that there was saopy/foaming water at site, this was not sighted 1. 5 hours after phone call.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au