Site visit details

Overview

Catchment Yarra River
Site Darebin Creek at Darebin Parklands, ford (dog crossing) U/S railway bridge. ME_YDA558
Date and Time Friday 17th January 2020 10:20am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 101.84 9 330 6.9 0.1 22.3 21.4 13
Weather cloudy
Last rainfall During the last week 50.60
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Muddy
Stream depth 0 - 50cm
Stream width > 5m
Hazards
Litter/Pollutants plastic,packets

Peter, Margaret, Penny and Richard Akers (MW) observing.

Heavy recent rain in the last week has deposited debris on the banks and pushed grass over.
Water a bit murky, and water level higher than normal.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au