Waterwatch Data Portal
ME_EBI200 Bittern catch drain, 20m above Devilbend Creek
18 February 2020
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Bittern catch drain, 20m above Devilbend Creek ME_EBI200 |
Date and Time | Tuesday 18th February 2020 11:20am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 90.87 | 8 | 940 | 7.5 | 0 | 22 | 21.5 | 90 |
Weather | raining |
---|---|
Last rainfall | Raining now 5.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Stained brown,Muddy |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | steep banks and slippery at times after wet weather |
Litter/Pollutants |
water level falling .very muddy,this area is always very muddy and discolored after construction of bypass pipe.plant are starting to grow now
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au