Waterwatch Data Portal
ME_EDV300 Devilbend Reservoir, western tip, accessible by 2wd track
18 February 2020
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Devilbend Reservoir, western tip, accessible by 2wd track ME_EDV300 |
Date and Time | Tuesday 18th February 2020 10:19am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 93.24 | 8 | 1210 | 7 | 0 | 20.6 | 22.8 | 14 |
Weather | raining |
---|---|
Last rainfall | Raining now 5.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | > 5m |
Hazards | very soft mud at waters edge. correct footwear and caution. path very wet and slippery |
Litter/Pollutants |
very soft mud near water lots of reeds ang growth near the waters edge
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au