Site visit details

Overview

Catchment Barwon River
Site Lake Victoria outlet @ Bellarine Hwy CO_SWA110
Date and Time Monday 30th March 2020 15:30pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb FTU Turb NTU
Sample 86.91 5.5 77750 8.1 0.015 23 20 2
Weather sunny
Last rainfall During the last 24 hours
Flow estimate PERMANENT: wetlands and lakes
Water Appearance Clear
Stream depth Other:Unknown
Stream width > 5m
Hazards
Litter/Pollutants

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au