Waterwatch Data Portal
ME_YML057 Mullum M Creek -Whitefriars C Grounds dwnstr Sewerge Outlt
18 June 2020
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Mullum M Creek -Whitefriars C Grounds dwnstr Sewerge Outlt ME_YML057 |
Date and Time | Thursday 18th June 2020 14:40pm |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 470 | 7.9 | 0.04 | 12 | 10 | 3 |
Weather | sunny |
---|---|
Last rainfall | During the last week 0.00 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear,Smelly,Stained brown,Stained green |
Stream depth | Other:99cm |
Stream width | 2m - 5m |
Hazards | Tripping hazard from tree roots and soft ground |
Litter/Pollutants | bottles,paper,plastic |
Mullum Mullum Creek was clear and flowed slowly. Slight smell but no runoff coming out of outlet.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au