Site visit details

Overview

Catchment Bunyip River
Site Main Creek at Baldry's Rd crossing ME_EMI200
Date and Time Friday 6th August 2010 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 84.08 8 800 4.5 0 11.5 10.2 10
Weather overcast
Last rainfall During the last 24 hours 70.00
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Muddy
Stream depth Other:110 mm
Stream width Other:4.5 m
Hazards
Litter/Pollutants

Near flood levels

Low pH may be due to recent calibration; to be monitored

Conductivity due to particularly good flushing of creek and catchment; reading might be expected

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au