Waterwatch Data Portal
ME_EMI200 Main Creek at Baldry's Rd crossing
22 September 2011
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Main Creek at Baldry's Rd crossing ME_EMI200 |
Date and Time | Thursday 22nd September 2011 09:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.5 | 58.17 | 6 | 1126 | 7.8 | 0.03 | 17 | 13.8 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week 0.00 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Clear |
Stream depth | Other:75 mm |
Stream width | Other:4 m |
Hazards | |
Litter/Pollutants |
Wood debris
Dissolved oxygen % calculated to be 0.78
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au