Site visit details

Overview

Catchment Bunyip River
Site Main Creek at Baldry's Rd crossing ME_EMI200
Date and Time Monday 8th August 2016 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.01 72.1 8 962 7.6 0.01 13 10.6 0
Weather cloudy
Last rainfall During the last week 0.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth Other:51-99 cm
Stream width Other:4 m
Hazards
Litter/Pollutants

Turbidity measured: ˂ 10

Dissolved 0xygen % calculated: 75%

Conductivity measured in uS/cm3

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au