Site visit details

Overview

Catchment Bunyip River
Site Main Creek at the Noxon property ME_EMI100
Date and Time Thursday 22nd September 2011 08:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.08 60.32 6 930 7.5 0.03 17 15.5 10
Weather sunny
Last rainfall During the last week 0.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth Other:20 cm
Stream width Other:1.5
Hazards
Litter/Pollutants

Dissolved O % calculated: 0.85

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au