Site visit details

Overview

Catchment Bunyip River
Site Main Creek at Shands Rd crossing ME_EMI150
Date and Time Monday 8th August 2016 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.01 80.91 9 927 7 0.01 13 10.5 9
Weather overcast
Last rainfall During the last week 10.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth Other:39 cm
Stream width Other:3 m
Hazards
Litter/Pollutants

Dissolved O: 82%

Turbidity recorded as < 10

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au