Waterwatch Data Portal
ME_YWP004 Westgate Park - Dam (Outlet), Port Melbourne
13 April 2019
Site visit details
Overview
Catchment | Maribyrnong River |
---|---|
Site | Westgate Park - Dam (Outlet), Port Melbourne ME_YWP004 |
Date and Time | Saturday 13th April 2019 10:30am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | sunny |
---|---|
Last rainfall | More than a week ago 2.00 |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Water level has not increased since last month. There is currently no water in the wetland. Cracks on lake beds had formed. There are still wetland plants at the site but it was not possible to take any sample.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au